[1]
2024. Pelatihan Pembangkit Listrik Tenaga Surya Off Grid Pure Sine Wave (Psw) Capasitas 1000 Wp di Smk Negeri 1 Minas. FLEKSIBEL: Jurnal Pengabdian Masyarakat. 5, 1 (Apr. 2024), 112–120. DOI:https://doi.org/10.31849/fleksibel.v5i1.16597.