[1]
“PENGARUH OVERTIME TERHADAP ANALISA TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GUDANG ARSIP DAN PERLENGKAPAN PEKANBARU”, Siklus, vol. 4, no. 1, pp. 1–13, Apr. 2018, doi: 10.31849/siklus.v4i1.907.