[1]
Yasri, D. 2018. PENGARUH OVERTIME TERHADAP ANALISA TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GUDANG ARSIP DAN PERLENGKAPAN PEKANBARU. Siklus : Jurnal Teknik Sipil. 4, 1 (Apr. 2018), 1-13. DOI:https://doi.org/10.31849/siklus.v4i1.907.