(1)
PENGARUH OVERTIME TERHADAP ANALISA TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GUDANG ARSIP DAN PERLENGKAPAN PEKANBARU. Siklus 2018, 4 (1), 1-13. https://doi.org/10.31849/siklus.v4i1.907.