“OPTIMASI WAKTU PROYEK DENGAN PENAMBAHAN JAM KERJA DENGAN PRECEDENCE DIAGRAM METHOD (Studi Kasus Proyek Rumah Susun Sederhana Sewa Pekanbaru)”. Siklus : Jurnal Teknik Sipil, vol. 1, no. 2, Oct. 2015, pp. 119-30, https://doi.org/10.31849/siklus.v1i2.178.